A newspaper spread with the headline “SeaTwirl kvar med prototyp i Lysekil till åtminstone 2024”, a portrait of SeaTwirl’s communications officer and a photograph of the turbine

News

SeaTwirl in Lysekilsposten

In this article made by Lysekilsposten, you can read about SeaTwirl S1 and the upscaled generation S2.

SeaTwirl's Communication Manager, Elsa Gejrot Mellstig, was interviewed by Lysekilsposten, with focus on SeaTwirl S1, our 30 kW floating wind turbine which has been installed off the coast of Lysekil since 2015.

SeaTwirl S1 is one of the very few floating wind power projects in the world to have been launched and operated for a longer period of time, and has withstood harsh weather conditions, autumn and winter storms reaching hurricane wind speeds. This shows how robust our design is.

02Related posts

Interview

Interview with SeaTwirl's CEO

SeaTwirl's CEO, Peter Laurits, was interviewed by Aktiespararna where he talked about the benefits of vertical-axis wind turbines and renewable energy. Read the full article here (in Swedish only)

Links

  1. [1] Back to the main site seatwirl.com/
  2. [2] SeaTwirl S1 seatwirl.com/products/seatwirl-s1/
  3. [3] You can read the article here (in Swedish) seatwirl.com/wp-content/uploads/SeaTwirl-Lysekilsposten-20-jan-2022.pdf